THE PROJECT
Site context.
Practical findings.
A desk study determines what issues relating to historical contamination may affect the site, this is undertaken by reviewing the site history using a combination of O.S. maps, aerial, plates and street level imagery, a review of data held by regulatory bodies (Environment Agency, local authority, BGS etc.) as well as a site walkover survey.
The O.S. maps revealed that the site was developed prior to the first edition (1887) O.S. map and the site formed part of a farmyard. The first large scale map revealed two ponds on the southern area of the site, which were in-filled in the 1960’s, the eastern area of the site was developed around the same time and a number of buildings had been erected.
The O.S. maps revealed a number of in-filled ponds in close proximity to the site as well as a graveyard.
The sensitivity of the groundwater and surface water receptors were assessed using the geological maps published by the BGS as well as data provided by the Environment Agency, which determined that all receptors were of low sensitivity and further assessment was not warranted.
Off site potential sources of contamination (including landfills) were researched using data provide by both the Environment Agency and Groundsure, no further off site potential sources were identified.
On completion of the desk based assessment a site reconnaissance visit was undertaken, six agricultural buildings were identified on the site, concrete hard-standing and a landscaped area. Cement sheeting was identified on the site and as there was no evidence of damage, was discounted as a credible source.
A quantitative risk assessment was undertaken and the made ground identified on the site and the in-filled ponds on the site were regarded as credible potential sources of contamination.
It was concluded that an intrusive site investigation to assess the risks posed by the made ground and the material in the in-filled pond was required. It was concluded that the risks from ground gases was sufficiently low as for gas protection measures to be a suitable alternative to ground gas monitoring.
The contaminated land planning condition was discharged as part of 16/80213/COND , desk study report can be accessed via the documents tab (identified as ‘16-03-23-Land_at_Church_Farm_FINAL’ in three parts) the memo accepting the recommendations of the report (identified as ‘Consultee comment Env. Health’) can be accessed via the application.
This case study records the project circumstances and conclusions at the time of the work. Planning links may refer to historical council systems.
YOUR NEXT PROJECT
A different site.
The same careful approach.
Send us your site address, development plans and any planning conditions. We’ll help establish the right scope of assessment.