DEMETER ENVIRONMENTAL / CASE STUDY
Residential Development on a Former Joiners Workshop, Wimbotsham, King's Lynn, Norfolk
THE PROJECT
Site context.
Practical findings.
Given the past industrial use of the site Demeter Environmental were commissioned to undertake the required works to discharge the contaminated land planning condition.
As part of the walkover survey trial pits were excavated in the vicinity of a known fuel tank and samples were tested as part of the desk study to determine any potential risks.
Further intrusive works were required after completion of the demolition works to determine if any risks were present across the site and concluded that concentrations of arsenic int he made ground on the site posed a potential risk to human health, and remediation was proposed.
The site was sold and we had no further involvement with the subsequent remediation.
This case study records the project circumstances and conclusions at the time of the work. Planning links may refer to historical council systems.
YOUR NEXT PROJECT
A different site.
The same careful approach.
Send us your site address, development plans and any planning conditions. We’ll help establish the right scope of assessment.