DEMETER ENVIRONMENTAL / CASE STUDY
Erection of a Detached Dwelling on a Garden at Church Broughton, Derby
THE PROJECT
Site context.
Practical findings.
Due to the sensitive nature of the proposed development (residential) contamination is assumed until demonstrated otherwise, hence a contaminated land planning condition was attached to the decision notice for the proposed development. (reference 09/2009/0399).
The first stage of discharging the condition was the preparation of a Phase I desk study report, Demeter Environmental Ltd was commissioned to prepare a desk Study report.
No further salient information was provided by regulatory bodies.
On completion of the desk based assessment a site walkover survey was undertaken, this confirmed the site formed part of the garden of the adjoining dwelling.
As part of the survey a hand held trial pit was excavated in order to assess the potential risk of made ground being present, no made ground was noted.
This case study records the project circumstances and conclusions at the time of the work. Planning links may refer to historical council systems.
YOUR NEXT PROJECT
A different site.
The same careful approach.
Send us your site address, development plans and any planning conditions. We’ll help establish the right scope of assessment.





