Residential Development, Station Close, Radcliffe, Manchester, M26 4GW

DEMETER ENVIRONMENTAL

Home / Case Studies

Residential Development, Station Close, Radcliffe, Manchester, M26 4GW

← All case studies

Residential Development, Station Close, Radcliffe, Manchester, M26 4GW

Case study reference: CS19-01-16

Planning authority: Bury Metropolitan Borough Council

Planning reference: Bury Metropolitan Borough Council · 63002

Project overview

As the site was within a ‘Development High Risk Area’ as defined by the Coal Authority a Coal Mining Risk Assessment was required to support the planning application in order to demonstrate that the site can be safely developed.

 The assessment comprised of the review of the published geology provided by the British Geological Survey (BGS) as well as borehole records in the public domain as well as information held by the Coal Authority.

The published geology revealed the site was underlain by Devensian Till (clay) and Lower Pennine Coal Measures.  No borehole records were available in the vicinity of the site.

Information provided by the Coal Authority revealed they believed a coal seam (Trencherbone) outcropped on the site and there was thew possibility of shallow unrecorded worked coal seams.

Given the potential risk to surface stability further works including the sinking of three rotary boreholes to 30mbgl as trial trenches if required were proposed.

The report is available as part of the documentation supporting the application (page 2 identified as ‘Coal Mining Risk Assessment and plan 19-1-16 Rev 0’ dated 1st February 2019) as well as the formal acceptance of the report and removal of the objection by the Coal Authority (‘Coal Authority – withdraw objection – recommend co’ dated 12th February 2019).

This case study records the project circumstances and conclusions at the time of the work. Planning links may refer to historical council systems.

Support for your site

Explore our environmental and geotechnical services or request a quotation.