Conversion of an Agricultural Barn to 2 Dwellings, Woodford Lane West, Winsford
THE PROJECT
Site context.
Practical findings.
The first stage of discharging the condition was to prepare a Phase I desk study report for the site, this assesses the potential for the site to be impacted by contamination from potential sources both on and off the site.
Geological maps identified the site as being underlain by Devensian Till and mudstone.
Data provided by the Environment Agency identified a tank on the site.
On completion of the desk based element a site reconnaissance
visit was undertaken to provide further information on the potential issues on the site. This revealed the site was an active farm with a number of building used to house livestock, the storage of plant, unbunded fuel tank and cement sheeting was noted during the site visit. The pond to the east of the site was inspected and it was clear the pond had not been in-filled.
On completion of the site visit the risk posed by the potential sources of contamination were assessed using a qualitative assessment, this concluded that the made ground on the site, the tank and the past uses of the buildings all had the potential to impact site soils. Based on this further works were proposed which were given in the report.
This case study records the project circumstances and conclusions at the time of the work. Planning links may refer to historical council systems.