Pre Purchase Audit, Industrial Estate, Birkenhead, Merseyside
THE PROJECT
Site context.
Practical findings.
As part of the documentation required to assess the potential liabilities of the industrial estate before agreeing to the purchase a Phase I desk study report was required in order to determine the potential liabilities associated with historical contamination in the site soils.
The site was also adjoined by a Chemical Works, which by 1899 was a manure works.
The existing buildings were erected circa 1967 when the site was a pet food factory, the site was identified as a works on subsequent maps.
It was concluded that there was a credible risk that waste from both the chemical works and manure works have been deposited in the excavations on the site as well as a risk from ground gases form both the site soils and nearby landfills, the adjoining land uses (industrial and commercial) was also regarded a having the potential to impact site soils.
A qualitative risk assessment was undertaken which determined that the site has the potential to be impacted by elevated levels of contamination,and whilst the site is unlikely to be classified as ‘Contaminated Land’ under Part 2A, a limited investigation targeting the in-filled ponds on the site was proposed to obtain additional information as to the site soils.
This case study records the project circumstances and conclusions at the time of the work. Planning links may refer to historical council systems.