PROJECT OVERVIEW

Industrial site desk study in Kendal

For an industrial extension and new building at Mintsfeet Road South, Kendal, the desk study reviewed the former depot setting, nearby landfills and made ground. The assessment considered the proposed building layout and identified water-main specification or targeted investigation as the remaining action. The project record includes acceptance of the report.

Explore related expertise

Phase I desk study · More case studies for this council area · Related project: Phase 1 desk study in Lewes

Discuss a new site with our Liverpool, Brighton or Cumbria office. Browse the UK project map for other locations.

In order to support the application for the extension of the existing industrial building and the erection of a new building a desk study report was required to support the application in order to demonstrate the site can be safely developed.

The desk study is a document that assess the potential issues on a site relating to historical contamination based on a review of site history (O.S. maps, aerial plates and street level imagery) as well as data held by regulators (Environment Agency, local authority etc.)

The historical review indicated the site was developed in the 1950’s and likely formed part of the adjoining Brewery Distribution Depot.

Data provided by the Environment Agency identified landfills within 250m of the site.

On completion of the desk based assessment a site walkover survey was undertaken in order to determine if there any source so contamination on the site.

The site comprised of a single story building which was used as offices and a workshop with inspection pit, the external areas was used for vehicle storage.  Evidence of made ground was noted during the survey.

Whilst the desk study report identified made ground on the site as a credible source of contamination, the design of the proposed buildings (no landscaped areas, open units) broke the majority of the pathways relating to the made ground.

The qualitative assessment undertaken in report concluded that either any new water mains should be specified as barrier pipe or an investigation along the proposed water mains alignment should be undertaken.

The desk study report was submitted with SL/2016/0154, identified as Contamination report dates 30th March 2016 (5 parts) with the memo accepting the report (‘Enviromental; Health Officer’ dated 15th April 2016).

This case study records the project circumstances and conclusions at the time of the work. Planning links may refer to historical council systems.

Project details

Case study reference: 16-03-12

Planning authority: South Lakeland District Council

Planning reference: South Lakeland District Council · SL/2016/0154