DEMETER ENVIRONMENTAL / CASE STUDY

Residential Development on a Former Joiners Workshop, Wimbotsham, King's Lynn, Norfolk

Residential Development on a Former Joiners Workshop, Wimbotsham, King's Lynn, Norfolk

THE PROJECT

Site context.
Practical findings.

Given the past industrial use of the site Demeter Environmental were commissioned to undertake the required works to discharge the contaminated land planning condition.

As part of the walkover survey trial pits were excavated in the vicinity of a known fuel tank and samples were tested as part of the desk study to determine any potential risks.

Further intrusive works were required after completion of the demolition works to determine if any risks were present across the site and concluded that concentrations of arsenic int he made ground on the site posed a potential risk to human health, and remediation was proposed.

The site was sold and we had no further involvement with the subsequent remediation.

The combined desk study report / Phase II investigation can be accessed here, the emo confirming the acceptance of the report can be accessed here.

This case study records the project circumstances and conclusions at the time of the work. Planning links may refer to historical council systems.

Project details

Case study reference: 12-05-09

Planning authority: Borough Council of King’s Lynn & West Norfolk

Planning reference: 10/01659/O

YOUR NEXT PROJECT

A different site.
The same careful approach.

Send us your site address, development plans and any planning conditions. We’ll help establish the right scope of assessment.